|
Message/Author |
|
Becky Ready posted on Tuesday, November 08, 2011 - 8:42 am
|
|
|
1.) Does Mplus provide reliability estimates for observed indicators in a multilevel CFA? If so, how do I request them? 2.) If not, is using the standard formula of true variance/observed variance a sensible way to get estimates of reliability at the within and between level? |
|
|
1. No. 2. Yes. Besides looking at between and within, I would look at total. |
|
Back to top |
|
|